基本介紹
- 中文名稱:黃橋工業園區
- 行政區類別:江蘇省
- 所屬地區:南瀕江陰
- 面積:1172平方公里
- 人口:120萬
- 榮譽:國家級生態鎮
概況
區位
產業
科技
人才
生產要素
優惠政策及服務
一、Brief
Taixing, north of Jiangyin Bridge, an important portal from central & north Jiangsu to south Jiangsu, known as “Home of Ginkgo”, “Home of Education”, “Home of Building” and “Home of Reducers”, has joined in a row among the national basic competitiveness of economy counties (cities) for the 11th time and is one of Jiangsu Province Administrating Restructuring Pilot Counties (Cities) with the same administration authority as that of cities divided into districts. Taixing has a population of 1,200,000 and 1,172 square meters in area.
Huangqiao ,“Sub-Centre” of Taixing, “Little City” of Taizhou, “Strong Town to Enlarge” pilot town, with the same administrative approval authority as that of Taixing, has a population of 200,000 (120,000 in downtown) and 180 square meters in area.
二、Location
Huangqiao Industrial Park lies in the gateway of Yangtze Delta. There’re entrances and exits of Jing-Hu Express, Ning-Tong Express and Ning-Jing-Yan Express. It takes about 2 hours from Shanghai Hongqiao Airport to Huangqiao Industrial Park (Hu-Ning Express—Yanjiang Express—Jiangyin Bridge, reach Huangqiao Industrial Park in 15 minutes) by car. It only takes about 1 hour from Yangzhou-Taizhou International Airport, Nantong, Wuxi, or Changzhou Airport by car. It takes only 40 minutes to Shanghai by train (Hu-Tai Railway planned);
Waterway: Taixing Port, 40KM away from Huangqiao, is open for foreign vessels. It’s a natural port,15m deep in low water period and over 20m deep in high water period. Many chemical, construction, LG and oil products have been built there. The Max. berth is up to 50,000T for handling of containers and bulk cargos. The annual handling is about 450,000T. It only takes about 1 hour to Rugao Port, Jiangyin Port or Taizhou Port by car.
ROAD WATERWAY
To Shanghai: 185KM 100Miles
There have been over 500 electromechanical enterprises in Taixing covering three main industry chains: reducers, shipbuilding and auto parts. In addition, there is fine forging chain based on cold, hot and fine forged gears, crankshaft and con-rod and electronics chain based on no-contact distributor, high voltage ignition coil and sensor. Diesel engine products have occupied 65% of domestic market and fine forging products have occupied 60% of domestic market.
To Nanjing: 160KM 90Miles
To Suzhou: 120KM 65 Miles
To Hangzhou: 310KM
To Ningbo: 380KM
四、Technology
Huangqiao Industrial Park pays great attention to technology, actively sets up technology support platform, closely cooperates with Tsinghua University and Nanjing Forestry University, tries her best to be the brooder of provincial modern equipment manufacturing and provides technical service and support for the technical research, innovation and design of the electromechanical enterprises.
Taixing lies in the centre of Shanghai and Nanjing talents circle. It’s our tradition to respect the teachers and pay attention the education. Our education is famous around the whole nation. We send over 5,000 outstanding talents to the colleges and universities every year, among them 2,000 are from Huangqiao High School, providing talent security for local economic and social development. Taixing Municipal Party Committee and Government continue to optimize policy, improve the introduction and training of talents policy, has introduced a series of policies to attract high-level talents to create “Talent Highland”.
There’re two high vocational colleges and two secondary vocational schools with machinery manufacturing, mould and electronic structure departments to train industrial talents pointedly. We train all kinds of technical talents every year according to the enterprises’ requirements to effectively guarantee labor demands.
六、Production Factors
1、Water:Yangtze River water is directly supplied by Taihuang Water-Supplying Project with total investment of RMB 240,000,000. Water for industry: RMB3.62 yuan/T. Half price can be applied if a lot of water is needed.
2、Electricity:Electricity is available around the clock. There is Dongjin Transformer Station and Xiaozhuang Transformer Station with two 20000-KV transformers separately in the park. We’ll build Shenli Transformer Station with 80000KV capacity in 2013.
According to Jiangsu document (2011) 358, residents electricity(peak/valley):RMB0.52/Kwh/0.35/Kwh;industryelectricity(peak/par/valley):RMB1.47/Kwh/0.882/Kwh/0.394/Kwh
par:12:00-17:00、21:00-24:00;
valley:0:00-8:00。
3、 Heat: Vapor supplying capacity: 150T/H; Price: RMB220/T (including tax).
4、 Sewage Treatment:Design treatment capacity of the sewage treatment factory is 50000T/D. Pipe connection standard: COD≤500 BOD≤300, price: RMB 3/T.
5、 Labor Cost:There’s rich labor resource. Monthly average wage is around RMB 1500 ( for guiding).
6、 Transportation Cost:
(1) Railway:RMB 0.08-0.1/T·KM。
(2) Road:RMB 0.50/T·KM
7、 Land Cost:
(1)Land:Max. transfer terms: residential 70 years; industrial 50 years; science, education, culture & health 50 years; commerce & trade 40 years; comprehensive development 50 years.
(2)Price: RMB168,000/MU. The price based on project investment, technology content and electric efficiency will be specified according to the park’s industrial location and direction.
(3)Land Usage of Buildings around: multi-floor,building density 45%、volume ratio 1.0-2.0; low buildings,building density 55%、volume ratio 0.7-1.2。
8、 Building Cost:workshop ( including base): heavy industry workshop:RMB800—1000/m2,multi-floor reinforced concrete workshop:RMB800/ m2,light steel structure workshop:RMB450-550/ m2。
1、Land Expropriation: About 3 square meters is available at present in the park. If any enterprise has interest, especially those large, leading ones, shall enjoy a certain level of land supplement from the park finance.
2、Supporting Facilities:The park will supply water, electricity, gas, road, green plants, road lights etc. to the new enterprise for free before new project is in use.
3、Finance Support:For the new project, if the enterprise needs financing, the park will help with the bank and other related departments.
4、Charge Preference:From establishing the project to be in use, the park will not charge the related fees except which is handed to the province.
5、Advance Support:If there is some technology content in the new project, the park will help apply for all kinds of finance support as well as other preferential policy.
6、Certificate Service:The park will be in charge of handling the certificates needed by the new enterprise for starting the project.
7、Labor Policy:The park will hold labor employment fair or appoint the vocational school to train skilled workers according to the requirements of the enterprises.