7、Division and Integration of Labor Based on Capability: An Effective Way to Make Knowledge Workers Productive. ICIM’2004 Proceedings of the Seventh International Conference on Industrial Management, November 15-17, 2004, OKAYAMA, JAPAN. Beijing: China Aviation Industry Press.
8、Study on the Coupling Model of System Composing Factors of PTE, Proceedings of the 38 International Conference on Computers and Industrial Engineering, Oct.31-Nev.2/2008,Beijing, China. Published by Publish house of Electronics Industry,2008.
9、Study on Project Team Effectiveness from the Angle of System Management, Proceedings of the Second International Conference on Management Science and Engineering Management, Nov. 3-8, 2008, Chongqing, China. Published by World Academic Union,2008.
10、基於成熟度的項目團隊效能研究,東嶽論叢,2009年第5期。
11、Study on ANP-Based Evaluation System of Project Team Effectiveness Maturity, Proceedings of the Third International Conference on Management Science and Engineering Management, Nov. 2-4, 2009, Bangkok, Thailand. Published by World Academic Press, World Academic Union,2009. 基於ANP的項目團隊效能成熟度評估體系研究,第三屆管理科學和工程管理國際會議,2009.09,EI檢索。
12、Study on the Maturity -Based Evaluation System of Talents’ Development in Knowledge Enterprises. 2009 Int'l Conference on Engineering Management and Service.基於成熟度的知識型企業人才開發體系評估研究,2009年工程管理和服務國際會議論文,2009.09,EI檢索。
13、Design of Organization Structure of Overseas Branches Based on Project Management ——Taking the Case of International Engineering Branch of Shandong Electric Power Construction Company,Proceedings of the International Conference on Computers & Industrial Engineering (CIE39), July,2009,,Troyes, France. Published by the IEEE. 基於項目管理的海外分公司組織架構設計研究,2009年計算機和工業工程國際會議,EI檢索。