《碾壓式土石壩施工規範(英文版)》為碾壓式土石壩施工規範( DL/T5129-2001)的英文版。本標準給出了碾壓式土石壩的技術要求和安全監測、質量控制等內容。本標準適用於1、2、3級碾壓式土石壩的施工,4、5級土石壩應參照知執行。
基本介紹
- 書名:碾壓式土石壩施工規範
- 出版社:中國電力出版社
- 頁數:94頁
- 開本:32
- 品牌:中國電力出版社
- 作者:中華人民共和國國家經濟貿易委員會
- 出版日期:2008年5月1日
- 語種:英語
- ISBN:7508368320, 9787508368320
內容簡介,圖書目錄,
內容簡介
《碾壓式土石壩施工規範(英文版)》由中國電力出版社出版。
圖書目錄
Foreword
1 Scope
2 Normative References
3 General
4 Survey
5 Diversion and Flood Control
5.1 General
5.2 Diversion during construction
5.3 Interception
5.4 Flood control
6 Treatment of Dam Foundation and Abutment Slopes
7 Re-inspection and Usage Plan of Dam Material
7.1 Re-inspection
7.2 usage Plan
8 Construction Test and Dam Material Processing
8.1 Construction test
8.2 Dam material Processing
9 Exploitation and Transportation of Dam Material
9.1 Exportation
9.2 Transportation
10 Filling
10.1 General
10.2 Filling
10.3 Construction During rainy season
10.4 Filling at negative temperature
10.5 Construction of impervious body with non-soil material
11 Treatment of Jointing portion
12 Filter,Drainge and Revetment
12.1 Filter
12.2 Drainage
12.3 Revetment
13 Safety Monitoring
14 Construction Quality Control
14.1 General
14.2 Quality control of dam foundation treatment
14.3 Quality control of borrow area
14.4 Quality control of dam filling
14.5 Quality control of revetment and drainage filter
Appendix A (Normative Appendix)Processing and Treatment of Dam Material
Appendix B (Normative Appendix)Compaction Test
Appendix C (Normative Appendix)Quality Control Management of Compaction
Appendix D (Normative Appendix)Definition of Expression
1 Scope
2 Normative References
3 General
4 Survey
5 Diversion and Flood Control
5.1 General
5.2 Diversion during construction
5.3 Interception
5.4 Flood control
6 Treatment of Dam Foundation and Abutment Slopes
7 Re-inspection and Usage Plan of Dam Material
7.1 Re-inspection
7.2 usage Plan
8 Construction Test and Dam Material Processing
8.1 Construction test
8.2 Dam material Processing
9 Exploitation and Transportation of Dam Material
9.1 Exportation
9.2 Transportation
10 Filling
10.1 General
10.2 Filling
10.3 Construction During rainy season
10.4 Filling at negative temperature
10.5 Construction of impervious body with non-soil material
11 Treatment of Jointing portion
12 Filter,Drainge and Revetment
12.1 Filter
12.2 Drainage
12.3 Revetment
13 Safety Monitoring
14 Construction Quality Control
14.1 General
14.2 Quality control of dam foundation treatment
14.3 Quality control of borrow area
14.4 Quality control of dam filling
14.5 Quality control of revetment and drainage filter
Appendix A (Normative Appendix)Processing and Treatment of Dam Material
Appendix B (Normative Appendix)Compaction Test
Appendix C (Normative Appendix)Quality Control Management of Compaction
Appendix D (Normative Appendix)Definition of Expression