內容簡介

《鐵路隧道設計規範(TB10003-2016 英文版)》由16章組成,包括總則、術語和符號、總體設計、隧道勘察、設計荷載、建築材料、隧道洞口、隧道襯砌、洞內附屬構築物及軌道、防水與排水、通風與照明、特殊岩土和不良地質、輔助坑道、施工方法及主要措施、隧道改建、環境保護,另有10個附錄。

圖書目錄

1 General Provisions
2 Terms and Symbols
2.1 Terms
2.2 Symbols
3 Overall Design
3.1 General Requirements
3.2 Selection of Tunnel Location
3.3 Plane and Longitudinal Profile of Tunnel Route
3.4 Inner Contour
3.5 Risk Assessment and Control
3.6 Works for Disaster Prevention, Evacuation and Rescue
3.7 Interface Design
4 Tunnel Prospecting
4.1 General Requirements
4.2 Investigation, Mapping, Exploration and Testing
4.3 Classification of Surrounding Rock
5 Design Load
5.1 General Requirements
5.2 Permanent Load
5.3 Variable Load
5.4 Accidental Load
6 Construction Materials
6.1 General Requirements
6.2 Concrete
6.3 Shotcrete
6.4 Steel
6.5 Stone and Masonry
6.6 Other Common Materials
7 Tunnel Portal
7.1 General Requirements
7.2 Design of Portal Section
7.3 Protection of Dangerous Rocks and Falling Rocks around Tunnel Portal
8 Tunnel Lining
8.1 General Requirements
8.2 Composite Lining
8.3 Segment Lining
8.4 Lining of Open Cut Tunnel
8.5 Lining Calculation
8.6 Requirements on Detailed Structures
9 Auxiliary Structures and Tracks in Tunnel
9.1 Chambers
9.2 Ditches and Troughs
9.3 Tracks
10 Waterproofing and Drainage
10.1 General Requirements
10.2 Waterproofing
10.3 Drainage
10.4 Waterproofing and Drainage of Portal and Open Cut Tunnel
11 Ventilation and Lighting
11.1 General Requirements
11.2 Ventilation during Construction
11.3 Ventilation during Operation and Ventilation for Disaster Prevention
11.4 Lighting
12 Tunnels in Special Rocks and Soils and Unfavorable Geological Conditions
12.1 Tunnels in Karst Region
12.2 Tunnels in Swelling Rock (Soil)
12.3 Tunnels in Gas-containing Ground
12.4 Tunnels in Goal Area
12.5 Tunnels in High Ground Stress Area
12.6 Tunnels in Radioactive Surrounding Rock
12.7 Tunnels in Loess
12.8 Tunnels in Aeolian Sand or Water-bearing Sand Strata
12.9 Tunnels in Very Cold and Cold Area
13 Construction Adits
13.1 General Requirements
13.2 Excavation, Supporting and Lining
13.3 Lateral Adit and Parallel Heading
13.4 Inclined Shaft and Vertical Shaft
14 Construction Method and Main Measures
14.1 General Requirements
14.2 Mining Method
14.3 TBM Method
14.4 Shield Method
14.5 Open-cut Method
14.6 Geological Prediction
14.7 Monitoring
14.8 Advance Supporting and Surrounding Rock Consolidation Measures
15 Tunnel Renovation
15.1 General Requirements
15.2 Requirements on Renovation
15.3 Electrification
16 Environment Protection
16.1 General Requirements
16.2 Water Resource Protection
16.3 Protection of Natural Environment and Nearby Buildings (Structures)
16.4 Disposal of Mucks Produced in Tunnel Construction
Appendix AConstruction Gauge of Railway Tunnel
Appendix BClassification of Surrounding Rock of Railway Tunnel
B.1 Basic Classification of Surrounding Rock
B.2 Modification of Classification of Surrounding Rock of Tunnel
Appendix CSub-classification of Surrounding Rock of Railway Tunnel
C.1 Sub-classification of Surrounding Rock
C.2 Modification of Sub-classification of Surrounding Rock
C.3 Physical and Mechanical Parameters of Surrounding Rock of Each Sub-grade
Appendix DCalculation Methods for Loads of Deep Tunnel
Appendix ECalculation Methods for Loads of Shallow Tunnel
Appendix FCalculation Methods for Loads of Asymmetrically-loaded Tunnel
Appendix GCalculation Methods for Loads of Open Cut Tunnel
Appendix HCalculation Methods for Portal Walls
Appendix JCalculation Methods for Loads of Shield-bored Tunnel
Appendix KTable of Performance Parameters of Common Shaped Steel
Words Used for Different Degrees of Strictness