1. Bo Chen and Xiandong Zhang. 2019. Scheduling with time-of-use costs. European Journal of Operational Research 274(3).900-908.
2. Zhongyi Jiang, Fangfang Chen, and Xiandong Zhang. 2017. Single-machine scheduling with times-based and job-dependent learning effect. Journal of the Operational Research Society 68(7).809–815.
3. Amir Hossein Gharehgozli, Yugang Yu, Xiandong Zhang, and René de Koster. 2017. Polynomial time algorithms to minimize total travel time in a two-depot automated storage/retrieval system. Transportation Science 51(1).19-33.
4. Xiandong Zhang,Yeming (Yale) Gong,Shuyu Zhou,René de Koster, and Steef van de Velde. 2016. Increasing the revenue of self-storage warehouses by optimizing order scheduling. European Journal of Operational Research 252(1).69–78.
5. Xiandong Zhang and Steef van de Velde. 2015. Two-machine interval shop scheduling with time lags. Journal of Scheduling 18(4).359-368.
6. Shuyu Zhang, Xiandong Zhang, Bo Chen, and Steef van de Velde. 2014. Tactical fixed job scheduling with spread-time constraints. Computers & Operations Research 47.53-60.
7. Yiqian Huang, Yanming Ge, Xiandong Zhang, and Yifan Xu. 2013. Overbooking for parallel flights with transference. International Journal of Production Economics 144(2).582-589.
8. Xiandong Zhang and Steef van de Velde. 2012. Approximation algorithms for the parallel flow shop problem. European Journal of Operational Research 216(3).544-552.
9. Zheng, R., H. Li, X. Zhang. 2012. Scheduling an unbounded batching machine with family jobs and setup times. Journal of the Operational Research Society 63(2).160-167.
10. Yugang Yu, George Q. Huang, Zhaofu Hong, and Xiandong Zhang. 2011. An integrated pricing and deteriorating model and a hybrid algorithm for a VMI (vendor-managed-inventory) supply chain. IEEE Transactions on Automation Science and Engineering 8(4).673-682.
11. Xiandong Zhang and Steef van de Velde. 2010. Polynomial-time Approximation Schemes for Scheduling Problems with Time Lags. Journal of Scheduling 13(5).553-559.
12. Xiandong Zhang and Steef van de Velde. 2010. On-line Two-machine Open Shop Scheduling with Time Lags. European Journal of Operational Research 204(1).14-19.
13. Xiandong Zhang, Steef van de Velde. 2010. On-line Two-machine Job Shop Scheduling with Time Lags. Information Processing Letters 110(12-13).510-513.
會議論文
1. Xiandong Zhang, Jatinder N.D. Gupta. 2007. Two-machine Shop Floor Scheduling Problem with Multi-predecessor Constraints. Paris, France 538-545.
2. 姜國平,張顯東. 2005. Analysis of Supply Chain SD Model:the Impact of Forecasting,Price,and Inventory. Vol. (11) .
學術專著
Xiandong Zhang. 2010. Scheduling with Time Lags. Erasmus University Rotterdam, Netherlands.