岔區板式與枕式無砟軌道施工技術(英文版)

岔區板式與枕式無砟軌道施工技術(英文版)

《岔區板式與枕式無砟軌道施工技術(英文版)》是2017年7月中國鐵道出版社出版的圖書,作者是李昌寧。

基本介紹

  • 中文名:岔區板式與枕式無砟軌道施工技術(英文版)
  • 作者:李昌寧
  • 出版社:中國鐵道出版社 
  • 出版時間:2017年7月
  • 開本:32 開
  • 裝幀:平裝
  • ISBN:9787113234096
內容簡介,圖書目錄,

內容簡介

《岔區板式與枕式無砟軌道施工技術(英文版)/高速鐵路無砟軌道施工技術叢書》按照高速鐵路無砟道岔下承軌結構形式的不同,分為板式岔區無砟軌道施工和枕式岔區無砟軌道施工兩部分,分別簡要介紹了道岔區無砟軌道不同的結構形式以及其他類型軌道結構的過度形式,詳細介紹了道岔區道床的施工工藝,提出了產品質量控制要點,重點介紹了岔區線路交接和控制測量、道岔運輸和存儲管理、道岔鋪設與精調、道岔鋼軌鋁熱焊接方式等。

圖書目錄

Part Ⅰ Construction of Slab Type Ballastless Track in Turnout Area
1 Structure Overview of Slab Type Turnout Area
1.1 The Structure of Slab Type Turnout Area on Subgrade
1.2 The Structure of Slab Type Turnout Area on Bridge
2 Track Intersection in Turnout Area and Turnout Laying Setting out
2.1 Track Intersection in Turnout Area
2.2 CPⅢ Track Control Network Resurvey
2.3 The Survey Coordinates Conversion for Datum Mark and Angular Point
2.4 Surveying for Foundation Piles of Slab Type Ballastless Turnout
3 Construction of Slab Type Turnout Area on Subgrade
3.1 Slab Type Turnout Laying on Subgrade
3.2 Construction Technological Flow
3.3 Construction Technology and Technical Requirement for Concrete Cushion
3.4 Construction Technology and Technical Requirement for Turnout Slab Laying
3.5 Assembly Technology and Technical Requirement for Turnout Steel Rail Piece
3.6 Labor Organization on Construction Site
3.7 Main Construction Machine and Equipment Configuration
3.8 Quality Inspection and Acceptance
3.9 Quality Control
4 Slab Type Switch Area Construction on Bridge
4.1 Slab Type Turnout Laying on Bridge
4.2 Construction Technological Flow
4.3 Construction Technology and Method
4.4 Quality Inspection for Turnout Slab Fine Adjustment
4.5 Labor Force Organization on Construction Site
4.6 Configuration of Main Construction Machine Equipment
4.7 Quality Control
Part Ⅱ Construction of Bailastless Track in Sleeper Type Switch Area
1 Overview of Sleeper Type Switch Area Structure
1.1 The Structure of Sleeper Type Switch Area on Subgrade
1.2 The Structure of Sleeper Type Switch Area on Bridge
2 Transportation, Storage and Hoisting for Turnout Materials
2.1 Transportation, Storage and Hoisting For Turnout Components
2.2 Transportation and Hoisting for Switch Track Section Components
3 Switch Area Track Intersection and Turnout Laying Setting out
3.1 Switch Area Track Intersection
3.2 CPⅢ Track Control Network Repeating Survey
3.3 Turnout Laying Setting out and Densified Point Surveying
4 Construction of Sleeper Type Turnout Area on Subgrade
4.1 Laying of Sleeper Type Turnout on Subgrade
4.2 Construction Technological Flow
4.3 Construction Technology and Technical Requirement for Concrete Supporting Layer
4.4 Construction Technology and Technical Requirement for Turnout Track Bed Slab
4.5 Labor Organization on Construction Site
4.6 Disposition for Main Construction Machine Equipment, and Inspection and Measuring Instrument
4.7 Quality Inspection and Acceptance
4.8 Quality Control
5 Construction of Sleeper Type Switch Areaon Bridge
5.1 Laying of Sleeper Type Switch Areaon Bridge
5.2 Construction Technological Flow
5.3 Construction Technology and Technical Requirement for Concrete Bed Plate
5.4 Paving Technology and Technical Requirement for Isolated Layer
5.5 Construction Technology and Technical Requirement for Turnout Track Bed Slab
5.6 Labor Organization on Construction Site
5.7 Disposition for Main Construction Machine Equipment, and Inspection and Measuring Instrument
5.8 Quality Control and Acceptance
5.9 Quality Control
6 Turnout Rail Welding
6.1 Overview
6.2 Construction Technological Flow
6.3 Construction Technology and Technical Requirement
6.4 Labor Organization on Construction Site
6.5 Disposition of Main Construction Machine Equipment, and Inspection and Measuring Instrument
6.6 Quality Inspection and Acceptance
6.7 Quality Control
References

相關詞條

熱門詞條

聯絡我們