中小型水力發電工程地質勘察規範(英文版)

中小型水力發電工程地質勘察規範(英文版)

《中小型水力發電工程地質勘察規範(英文版)》是2016年5月1日中國水利水電出版社出版的圖書,作者是National Energy Administration,P.R.China 。

基本介紹

  • 書名:中小型水力發電工程地質勘察規範(英文版)
  • 作者:National Energy Administration,P.R.China
  • 出版社中國水利水電出版社
  • 出版時間:2016年5月01日
  • 頁數:116 頁
  • 定價:240 元
  • 開本:32 開
  • 裝幀:平裝
  • ISBN:9787517042457
內容簡介,目錄,

內容簡介

This standard Code for Engineering Geological Investigation for Small and Medium Hydropower Projects was first issued in 2009.This standard has been proposed by and under the jurisdiction of the Technical Committee on Standardization of Hydropower and Water Resources Planning and Design.
This standard was drafted by HYDROCHINA Kunming Engineering Corporation.
The leading authors ofthis standard: WANG Wenyuan, WANG Zigao,XIAO Wanchun, LI Kaide, TANG Xianliang and YANG Yicai.
The English version of the Hydropower Investigation and Design Standards has been prepared by the HYDROCHINA International Engineering Co. Ltd, and reviewed and approved by HYDROCHINA CORPORATION.
The English version of this standard was translated by GUO Weixiang, ZHENG Kexun, LIU Jinyang, ZHONG Guohua and LU Xiaocang, and reviewed by LI Tianfu, LIU Xiaofen, LI Zhong, QI Guoqing, ZHANG Dongsheng, HOU Hongying, WAN Jun and PENG Shuojun.

目錄

Foreword
1 Scope
2 Normative References
3 Terms and Symbols
3.1 Terms
3.2 Symbols
4 GeneralProvisions
5 Engineering Geologicallnvestigation at Planning Stage
5.1 Generalrequirements
5.2 Regional geology and earthquake
5.3 Reservoir
5.4 Dam site
5.5 Long headrace route and powerhouse site
5.6 Natural construction materials
5.7 Investigationreport
6 Engineering Geologicallnvestigation at Pre-feasibility Study Stage
6.1 Generalrequirements
6.2 Regional tectonic stability
6.3 Reservoir
6.4 Dam site
6.5 Headrace route
6.6 Powerhouse site
6.7 Flood-dischargestructures
6.8 Natural construction materials
6.9 Investigationreport
7 Engineering Geologicallnvestigation at Feasibility Study Stage
7.1 Generalrequirements
7.2 Reservoir
7.3 Earth-rockfilldam
7.4 Concrete gravity dam
7.5 Concrete arch dam
7.6 Tunnels
7.7 Channel
7.8 Underground powerhouse system
7.9 Surface powerhouse system
7.10 Spillway
7.11 Navigationstructures
7.12 Main temporary structures
7.13 Natural construction materials
7.14 Investigationreport
8 Engineering Geologicallnvestigation at Tender Design Stage
8.1 Generalrequirements
8.2 Review ofengineering geologicalproblems
8.3 Special engineering geological problems
8.4 Temporary (Ancillary) building
8.5 Concentrated resettlement areas and special rehabilitation sites
8.6 Natural constructions materials
8.7 Investigationreport
9 Engineering Geologicallnvestigation at Detailed Design Stage
……

相關詞條

熱門詞條

聯絡我們