DL/T 507—2014 水輪發電機組啟動試驗規程(英文版)

DL/T 507—2014 水輪發電機組啟動試驗規程(英文版)

《DL/T 507—2014 水輪發電機組啟動試驗規程(英文版)》是2020年4月1日中國電力出版社出版的圖書,作者是中國電力出版社。

基本介紹

  • 中文名:DL/T 507—2014 水輪發電機組啟動試驗規程(英文版)
  • 作者:中國電力出版社
  • 出版社:中國電力出版社
  • 出版時間:2020年4月1日
  • ISBN:9787519843304
內容簡介,圖書目錄,

內容簡介

This standard is prepared in accordance with Notzjication on the development and revision plan of the secondbatch energy industrial standards in 2011 issued by National Energy Administration [GNKJ (2011)No.252].
This standard is structured and organized in accordance with Standard GB/T 1.1-2009 Directives for standardization-Part 1: Structure and drafting of standards.
The standard is a revision to standard DL/T 507-2002 Start-up test code for hydro-generating units (hereinafter referred to as the previous standard). Compared with the previous standard, the main technical changes include:
——Revised the limit on run-out (peak-to-peak value) for unit operation.
——Revised allowable values of horizontal and vertical vibration (peak-to-peak value) of turbine head cover with rated speed greater than 375 rpm to 750 rpm and allowable value of horizontal vibration (peak-to-peak value) of the frame at stator core, and added explanation on the characteristics of allowable values.
——Explained in details the parameter adjustment test for service water supply; and explained in details the short-circuit test for station service transformer by means ofhydro-generating units.
——Added test on injection-type ground protection of hydro-generating units.
——Revised loading and load shedding test of hydro-generating units; and added test on thermal stability of hydro-generating units.
——Clarified requirements for test on dynamic water closing service gate or inlet valve of turbine and test on closing ring gate ofhydro-generating units.
——Added requirements on simultaneous'load shedding test of multiple generating units that share a single waterway.
——Cancelled the requirement for 30-day comnussioning.

圖書目錄

Foreword
1 Scope
2 Normative References
3 General Provisions
4 Inspection before Start-up Test
5 Water Filling Test
6 Start-up and No-load Test
7 Test of Generator with Main Transformer and HV Switchgear
8 Synchronization and Loading Test
9 72h Continuous Test Run with Load
10 Handover and Putting into Commercial Operation
Appendix A (Informative) Recording Form for Load Shedding Test
Appendix B (Informative) List of Documents to be Handed over for Acceptance of Unit Start-up
Test Run
References